How I Spent My MLK Weekend


Hi, G-Pa!
Hi, G-Pa!
The pump and sink
The pump and sink
in the raw basement
in the raw basement
ready for studs
ready for studs
all around.
all around.
Studs around waste
Studs around waste
Studs on far wall
Studs on far wall
Studs around water meter
Studs around water meter
Plumbing (a bitch) in for washer and sink
Plumbing (a bitch) in for washer and sink
Vent in for drier and electrical
Vent in for drier and electrical
Electrical boxes and dividing wall
Electrical boxes and dividing wall
Next insulation (except for where plumbing dripping)
Next insulation (except for where plumbing dripping)
No insulation on inside walls
No insulation on inside walls
Finally the drywall
Finally the drywall
Sorry about the dust on the lens
Sorry about the dust on the lens
Pumpout still visible
Pumpout still visible
Access panels for water
Access panels for water
Builtin shelving
Builtin shelving
Laundry back home
Laundry back home
Detail
Detail
The floor was put in later by Garth
The floor was put in later by Garth
Notice the working music and plugs
Notice the working music and plugs
Another corner
Another corner