 Hi, G-Pa!
|
 The pump and sink
|
 in the raw basement
|
 ready for studs
|
 all around.
|
 Studs around waste
|
 Studs on far wall
|
 Studs around water meter
|
 Plumbing (a bitch) in for washer and sink
|
 Vent in for drier and electrical
|
 Electrical boxes and dividing wall
|
 Next insulation (except for where plumbing dripping)
|
 No insulation on inside walls
|
 Finally the drywall
|
 Sorry about the dust on the lens
|
 Pumpout still visible
|
 Access panels for water
|
 Builtin shelving
|
 Laundry back home
|
 Detail
|
 The floor was put in later by Garth
|
 Notice the working music and plugs
|
 Another corner
|